hot tub and entryway
The hot tub is uncrated and in place. Looks a lot deeper than the
numbers would indicate. It comes up to Heather's waist. The frame to
hold up the tub has been built. Stan found a damaged part (the heater
controller) and is going to ask Potsdam Plumbing to replace it.
While Stan was dealing with that, Jeff and Brent were preparing the
entryway floor. Dennis Sharlow is going to be available to pour the
two floors on Saturday, so we have to get the entryway and garage
floors ready to be poured. For the entryway, that means scraping off
the excess sand, putting down insulation, reinforcing mesh, and
heating tubes. For the garage, that means grading the sand with a
slope.
-russ