[Prev][Next][Index][Thread]

plumbing #1



The weather is too wet for working outside.  Everybody is working on
the drain stacks.  They've got the downstairs bathroom toilet flange
installed.  The vent for same is put halfway up.  The kitchen stack is
done up to the top of the main floor.  The laundry stack is done up to
the downstairs ceiling.
-russ