The weather is too wet for working outside. Everybody is working on the drain stacks. They've got the downstairs bathroom toilet flange installed. The vent for same is put halfway up. The kitchen stack is done up to the top of the main floor. The laundry stack is done up to the downstairs ceiling. -russ