[Prev][Next][Index][Thread]
just a few things
Stan, Jeff, and Brent worked on the garage acoutremont today. On the
hottest day in weeks, they dug holes and shifted rock and sand. They
put the insulated outdoor wood boiler hoses in, as well as the control
wires for the draft. They also put in the hose and wiring for the
submerged pump that goes in the well well (that is, they did a good
job on it). And after that was in, they put drain pipe around the
footers, filter fabric, and finally covered it all over with gravel.
I'm pretty sure that they're ready to backfill the garage, both inside
and outside.
-russ