[Prev][Next][Index][Thread]

upper cabinets hung



Brent had the day off today.  Stan and Jeff hung the upper cabinets.
They plumbed the kitchen sink, and installed the valance above the
sink.  They grouted the cement panels.  They installed the
microwave/stove hood.  Ready for tiling the floor tomorrow.
-russ