Nearly all of the fiberglass insulation is up. There's about a dozen joist bays that they didn't do in the ceiling, but all the rest of the fiberglass is up. Once they finish that, they'll be working on the vapor barrier, and the Reflectix insulation below the radiant tubes below the loft and upper floors. It's supposed to reflect the heat up, so that it heats the correct space. -russ